Lean Construction Journal

Lean Construction Institute

Journal websitePeer review: Double-blind review
Evaluation status available after sign-in

About the journal

Lean Construction Journal is an open-access journal published by Lean Construction Institute in United States, publishing in english. It is listed in DOAJ according to the sources read. Declared review time at DOAJ: 12 weeks. Facts are reproduced as recorded at their sources with their capture dates; PublishLens indicators are available after sign-in.

Basic facts

Publisher
Lean Construction Institute
ISSN
1555-1369
Country
United States
Languages
english
Access
Open access
Articles in DOAJ
0
Declared review time
12 weeks
Declared peer-review model
double_blind

Index listings

  • DOAJ · 2005-11-25
Indexing
DOAJ
APC
—
Declared review time (DOAJ)
12 weeks — journal-declared only (not measured)
Activity (OpenAlex)
Active — latest works 2026
PublishLens list status
Shown after sign-in
Counts for promotion at your university?
Choose your university and rank below ↓

Methodology signals (dated facts from their sources)

Details of the evaluation under the published methodology are shown to signed-in users (free).

Create a free account to view the evaluation

Journal profile

Descriptive metadata from public sources (DOAJ, OpenAlex, PubMed) as of the capture date shown — contains no assessment or judgment.

Articles in DOAJ

0

Average review time (journal-declared via DOAJ)

12weeks

Works in OpenAlex

105

Last recorded publication year

2026

Reported by OpenAlex in 2 of 3 sources (CC0 flags, not verified indexing)DOAJSciELOOpenAlex Core

h-index

25

i10-index

40

From OpenAlex open data (CC0).

Editorial & policy9
Last DOAJ review date
2021-06-28
Added to DOAJ
2005-11-25
Declared plagiarism screening
Not declared
Other fees beyond APC
No
Editorial board
Official page ↗
Norwegian register (HK-dir)— 2026
Level 1 — approved scholarly channel
Open references deposited at Crossref
0%
ORCID iDs in current deposits
35%
Peer-review policy
View policy
Identity & continuity1
Source type
journal
Classification2

Subjects (DOAJ)

Technology: Building construction

LCC codes

TH1-9745

Subject areas

  • BIM and Construction Integration
  • Construction Project Management and Performance
  • Construction Project Management and Performance
  • Construction Project Management and Performance
  • Quality and Supply Management
  • Quality and Supply Management
  • BIM and Construction Integration
  • Quality and Supply Management
Show all subjects (75)
  • BIM and Construction Integration
  • Value Engineering and Management
  • Construction Management and Sustainability
  • Quality and Management Systems
  • Quality and Management Systems
  • Public-Private Partnership Projects
  • Occupational Health and Safety Research
  • Sustainable Building Design and Assessment
  • Occupational Health and Safety Research
  • Management and Optimization Techniques
  • Sustainable Supply Chain Management
  • Manufacturing Process and Optimization
  • Outsourcing and Supply Chain Management
  • Design Education and Practice
  • Operations Management Techniques
  • Design Education and Practice
  • Digital Transformation in Industry
  • Facilities and Workplace Management
  • Occupational Health and Safety Research
  • Facilities and Workplace Management
  • Outsourcing and Supply Chain Management
  • Operations Management Techniques
  • Simulation Techniques and Applications
  • Educational Games and Gamification
  • Simulation Techniques and Applications
  • Product Development and Customization
  • Advanced Manufacturing and Logistics Optimization
  • Digital Transformation in Industry
  • Advanced Manufacturing and Logistics Optimization
  • Manufacturing Process and Optimization
  • Product Development and Customization
  • Big Data and Business Intelligence
  • Public-Private Partnership Projects
  • Organizational and Employee Performance
  • Complex Systems and Decision Making
  • Value Engineering and Management
  • Public-Private Partnership Projects
  • Big Data and Business Intelligence
  • Organizational and Employee Performance
  • Resource-Constrained Project Scheduling
  • Complex Systems and Decision Making
  • Engineering Education and Pedagogy
  • Occupational Health and Safety Management
  • Outsourcing and Supply Chain Management
  • Management and Marketing Education
  • Sustainable Supply Chain Management
  • Innovative Teaching Methodologies in Social Sciences
  • Business Process Modeling and Analysis
  • Product Development and Customization
  • Occupational Health and Safety in Workplaces
  • Civil and Structural Engineering Research
  • Business Process Modeling and Analysis
  • Service and Product Innovation
  • Building Energy and Comfort Optimization
  • Sustainable Supply Chain Management
  • Supply Chain Resilience and Risk Management
  • Ergonomics and Musculoskeletal Disorders
  • Systems Engineering Methodologies and Applications
  • Digital Transformation in Industry
  • Resource-Constrained Project Scheduling
  • Team Dynamics and Performance
  • Supply Chain Resilience and Risk Management
  • Service and Product Innovation
  • Traffic and Road Safety
  • Seismic Performance and Analysis
  • Migration and Labor Dynamics
  • scientometrics and bibliometrics research

Keywords (DOAJ)

  • lean construction
  • lean design
  • construction process

Community confirmations — what users saw in MJL or Scopus Sources; not platform verification and never part of any score.

Loading community confirmations…
How do we evaluate?Publisher of this journal? Appeal a derived assessment or request a factual correction

The journal's record in other sources:Web of Science MJLDOAJ

Everything shown here is produced automatically from named sources (DOAJ, OpenAlex, Crossref, PubMed, the Norwegian register) as of its capture date, with no human editing. Facts appear as recorded at the source; derived scores (PCI, PTD, PublishLens score) follow a published methodology. Not a judgement on the journal, not an official accreditation, not advice.

Wrong items are corrected automatically by re-reading the source (24 h for daily sources, 7 days for weekly ones) with a dated change log, and each item links to its source record. PublishLens-derived assessments are contested through the appeals mechanism (15 working days). Appeals · Indicator guide

Norwegian register data: Kanalregisteret (HK-dir, Norway) — CC BY 4.0 / NLOD — adapted: level extracted per year · OASPA member list — CC BY

Last automated source read: